More photos of the bridges i built.
Demolition- the bridge could withstand up to three 2.4 L bottles of juice and two 3.8 kg bricks. This bridge was only a practice one so that i could get a rough idea of the weight the bridges would hold and determine what i could use as a acceptable method of measuring their durability.
this is the same practice bridge( before it was destroyed) however i thought i could stack sprite bottles on top of each other to measure the durability. However this method was very hard to carry out because the cans were not very stable on top of each other and i couldn't stack more than 6 cans at a time.
No comments:
Post a Comment